Co-Living BTR Refurbishment: Planning for Fire Compliance and Resident Experience

Read the article

Co-living BTR schemes are expanding rapidly across the UK, offering a new accommodation model that appeals to young professionals, corporate tenants, and operators seeking well-used shared amenities.

Fire Safety Planning in Co-Living Schemes

Unlike traditional BTR, co-living properties combine private bedrooms with extensively shared common areas: kitchens, lounges, dining rooms, co-working spaces, and sometimes shared bathrooms. This creates a community-focused living environment.

This model presents significant advantages for operators. Shared facilities can make more efficient use of space and provide amenities that would be difficult to deliver within every individual unit.

For residents, co-living offers affordability, built-in community, and access to amenities that would be uneconomical in standard BTR flats.

However, co-living can create different refurbishment considerations from standard BTR. Shared spaces may see more foot traffic and wear on communal finishes, while occupied floors can make phased work and resident access more involved.

Fire-safety provision should be considered across the relevant rooms, circulation areas and communal infrastructure in line with the building fire strategy and risk assessment.

For property managers planning a co-living refurbishment, understanding these challenges at the outset makes the difference between smooth programme delivery and one that overruns, disrupts residents and leaves compliance gaps. Simetria coordinates fire door surveys and remediation around occupied co-living refurbishment schedules.

Fire-safety planning in co-living should reflect the building's use and design. Shared kitchens, lounges and corridors can create different movement patterns and maintenance considerations, but the required provision depends on the building fire strategy, compartmentation, escape design and applicable fire-risk assessment.

Fire-door locations and performance in shared circulation areas should be established through the building design, compartmentation, escape strategy and applicable fire-risk assessment.

The same principles apply to co-living and other residential buildings; the number and specification of doors should not be assumed from the accommodation label alone.

Fire-door requirements in shared kitchens depend on the space's relationship to compartments and escape routes, the building fire strategy, and the fire-risk assessment. Doors should be specified, installed and maintained in accordance with the applicable evidence and project requirements.

Kitchen use can increase wear on hardware, so condition and maintenance should be reviewed as part of the wider programme.

A comprehensive fire door compliance programme should form part of any co-living refurbishment, not as an afterthought but as a planned workstream running parallel with room and communal area upgrades.

Sequencing Works Around Occupied Shared Spaces

In standard BTR, residents can usually be decanted or absent during unit refurbishment. In co-living, decanting residents during communal area works is often impractical. Residents cannot abandon their accommodation because their kitchen, lounge, or corridor is being refurbished.

Works must be delivered around occupied spaces, with strict access controls and tight working windows.

This requires a different approach to programme planning. Kitchen refurbishment might be scheduled across several one-week windows, with temporary facilities provided during closure. Corridor and circulation works must be coordinated to avoid trapping residents or blocking escape routes.

Fire door replacement in shared areas adds complexity to this sequencing. A fire door in communal circulation areas cannot simply be left propped open during refurbishment; escape route integrity must be maintained throughout.

This means fire door works often need completion in very tight windows, sometimes outside normal working hours, or with temporary containment measures in place.

The contractor leading refurbishment must have experience in this type of sequencing and must coordinate fire door works explicitly as part of the overall programme, not as an independent activity.

Selecting and Specifying Finishes for High-Use Shared Spaces

Co-living communal areas may experience high levels of use. A lounge or shared kitchen can therefore benefit from finishes selected for durability, cleanability and straightforward maintenance, with the specification matched to the space and operating model.

When refurbishing, flooring, wall finishes and fixtures can be selected for the expected use, maintenance regime and design brief. Durable vinyl, polished concrete, timber, carpet or other finishes may be appropriate in different locations when their performance and maintenance implications have been assessed.

Fire-safety hardware in high-use communal areas should be selected with expected operation and maintenance in mind. Regular inspection and adjustment can help identify wear, while the appropriate hardware remains a matter for the doorset evidence, building design and fire-risk assessment.

The Case for Coordinated Delivery

Co-living refurbishment benefits from coordinated delivery. The complexity of co-living, with occupied shared spaces, multiple workstreams and sequencing constraints, can make coordination important.

A single integrated contractor may be able to sequence fire-door work, communal refurbishment and room upgrades together, helping reduce handover delays where the scope and delivery model are suitable.

A contractor experienced in co-living can anticipate operational challenges such as access restrictions, temporary facilities and resident communication, and build these into the programme from the outset.

For property managers planning co-living refurbishment, a contractor with relevant experience can be one suitable delivery option; the right procurement route depends on the scope, building constraints and operator's requirements.

Next Steps

If you are planning a co-living refurbishment programme and want to understand the full scope of compliance, sequencing, and specification challenges, Simetria can support you with detailed programme planning, fire door compliance review, and coordinated delivery.

Contact our team to discuss your project and how we can help you achieve safe, efficient, and compliant results.

CONFIGURE YOUR INTEGRATED PROJECT

Select what applies. We'll show relevant experience and get you talking to the right person

Select your option

(multiple select is available)

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.