ELEPHANT & CASTLE, LONDON

Fire Door Compliance

FIRE DOOR REMEDIATION | 578 FIRE DOORS

At Elephant & Castle, Simetria delivered targeted fire door compliance works across 578 doors within an occupied London residential building. The project formed part of the client's wider 11-building programme, allowing a consistent compliance methodology to be applied while tailoring the works to the needs of this individual asset.

‍

This 578-door project formed part of Simetria's wider 4,500 + fire door remediation programme across 11 residential buildings. A remediation-first approach was used to identify and address defects while retaining suitable existing doors wherever appropriate.

‍

This focused London programme demonstrates how Simetria scales its fire door delivery model to suit individual buildings without compromising consistency. The same controls, remediation-first principles and evidence-led approach used across the wider portfolio were maintained throughout the 578-door project.

‍

‍This project formed part of Simetria's wider fire door remediation programme across 11 residential buildings. Delivering the portfolio through one coordinated approach provided consistency in remediation methodology, quality assurance, reporting and accountability across more than 4,500 fire doors.

What we delivered

Door-by-Door Survey

01

Individual fire doors were assessed, defects recorded and corrective actions defined before works commenced.

Remediation-First Works

02

The programme focused on retaining and remediating suitable existing doors rather than defaulting to unnecessary replacement.

Digital Golden Thread

03

Inspection and completion information was recorded at asset level, supporting a clear compliance audit trail.

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.