ELEPHANT & CASTLE, LONDON
Fire Door Compliance
QuadReal
2025
London
Project Overview
FIRE DOOR REMEDIATION | 578 FIRE DOORS
At Elephant & Castle, Simetria delivered targeted fire door compliance works across 578 doors within an occupied London residential building. The project formed part of the client's wider 11-building programme, allowing a consistent compliance methodology to be applied while tailoring the works to the needs of this individual asset.
This 578-door project formed part of Simetria's wider 4,500 + fire door remediation programme across 11 residential buildings. A remediation-first approach was used to identify and address defects while retaining suitable existing doors wherever appropriate.
This focused London programme demonstrates how Simetria scales its fire door delivery model to suit individual buildings without compromising consistency. The same controls, remediation-first principles and evidence-led approach used across the wider portfolio were maintained throughout the 578-door project.
This project formed part of Simetria's wider fire door remediation programme across 11 residential buildings. Delivering the portfolio through one coordinated approach provided consistency in remediation methodology, quality assurance, reporting and accountability across more than 4,500 fire doors.
What we delivered
Door-by-Door Survey
01
Individual fire doors were assessed, defects recorded and corrective actions defined before works commenced.
Remediation-First Works
02
The programme focused on retaining and remediating suitable existing doors rather than defaulting to unnecessary replacement.
Digital Golden Thread
03
Inspection and completion information was recorded at asset level, supporting a clear compliance audit trail.