Resident Lounge to PBSA Studio Conversion, York

MAJOR PBSA STUDIO CONVERSION WORKS

MAJOR PBSA STUDIO CONVERSION WORKS

Simetria converted four former resident lounges into complete new student studio apartments — delivering construction works, new walls and layouts, bathroom pods, kitchens, M&E, interiors, new certified fire door sets and passive fire compartmentation entirely through our in-house team

A major £140k conversion project transforming four existing resident lounges within a York PBSA development into four new self-contained studio apartments. This was a complete change and reconstruction of the existing spaces rather than a conventional refurbishment, with Simetria delivering the works entirely through its in-house team.

‍

The programme included new internal walls and layouts, service alterations and connections, bathroom pods, fitted kitchens, flooring, lighting and electrical works, furniture and furnishings, together with the installation of new certified fire door sets and associated passive fire compartmentation. Each former communal space was taken from its existing configuration through construction, fit-out and fire-safety works to a fully completed new student studio ready for occupation.

‍

What we delivered

FOUR NEW STUDIOS CREATED FROM EXISTING LOUNGES

01

Complete conversion and reconstruction of four former resident lounge spaces into new self-contained student apartments, including strip-out, new walls and layouts, construction works and the integration of all services required for the new accommodation.

BATHROOM PODS, KITCHENS & COMPLETE INTERIORS

02

Installation and connection of new bathroom pods and fitted kitchens, together with flooring, lighting, electrical works, furniture and furnishings to create four fully finished and equipped student studios.

NEW CERTIFIED FIRE DOOR SETS & FIRE COMPARTMENTATION

03

New certified fire door sets were installed as part of the converted layouts, together with associated passive fire compartmentation and fire-stopping works, integrating fire safety and compliance into the construction of each new studio.

Deep insights on other projects we have delivered

More fire door, refurbishment and furniture projects delivered for PBSA, BTR and hotel operators.

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.