Full PBSA Summer Refurbishment Programme

Simetria upgraded 112 student studios in just eight weeks — integrating refurbishment, furniture, electrical and heating upgrades, and 120 new certified fire door sets within one fast-track summer programme.

112-STUDIO PBSA SUMMER REFURBISHMENT & 120 NEW FIRE DOOR SETS

A fast-track, integrated PBSA summer refurbishment programme delivered across 112 student studios in Liverpool. The works combined full internal refurbishment with new flooring, complete redecoration, furniture upgrades, new lighting and electrical works, new wall heating, and the survey, removal and replacement of 120 certified fire door sets. Delivered within an eight-week summer programme, the project brought refurbishment, M&E upgrades and fire safety works together under one coordinated delivery programme.

‍

What we delivered

112 x Studios Refurbished

01

Integrated summer refurbishment of 112 student studios, including new flooring throughout, full redecoration and furniture upgrades. Delivered as a coordinated fast-track programme within the restricted summer works period, ready for student occupation.

120 x New Certified Fire Door Sets

02

End-to-end fire door replacement programme comprising detailed fire door surveys, removal and responsible disposal of existing doors, and installation of 120 new UK-certified fire door sets, complete with full installation records, photographic evidence and a digital Golden Thread for every fire door asset.

Complete Lighting, Electrical and Heating Upgrades

03

Complete electrical upgrade across all 112 studios, including replacement of the existing lighting installation, associated rewiring and installation of new energy-efficient wall heaters. Works were coordinated within the wider refurbishment programme to deliver modernised, reliable and more efficient student accommodation.

6

Team Size

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.