BTR Rooftop & Resident Lounge Upgrade, London

BTR AMENITIES · ROOFTOP TERRACE · LOUNGE · BESPOKE FURNITURE

ROOFTOP COURTYARD & RESIDENT LOUNGE TRANSFORMATION

A resident amenity upgrade delivered within a fully occupied  BTR development in London. Simetria transformed both the external rooftop courtyard and internal resident lounge, creating refreshed communal environments designed to enhance the resident experience while the building remained operational throughout the works.

‍

The external works included new artwork and decorative improvements to the rooftop terrace and courtyard environment. Internally, the resident lounge was comprehensively upgraded with bespoke furniture, new flooring and decoration, together with lighting and heating improvements. All works were delivered directly by Simetria with careful sequencing to maintain access and minimise disruption to residents.

‍

What we delivered

ROOFTOP COURTYARD & EXTERNAL ARTWORK

01

Transformation of the rooftop amenity space through new external artwork, decoration and visual enhancements, creating a more distinctive and engaging outdoor environment for residents.

NEW RESIDENT LOUNGE & BESPOKE FURNITURE

02

Complete upgrade of the communal resident lounge incorporating bespoke furniture, new flooring and full decoration to create a refreshed, comfortable and contemporary shared living environment.

LIGHTING & HEATING UPGRADES IN OCCUPATION

03

Lighting and heating improvements delivered alongside the wider lounge refurbishment, with all works carefully managed within the occupied BTR development to minimise disruption and maintain resident access.

Deep insights on other projects we have delivered

More fire door, refurbishment and furniture projects delivered for PBSA, BTR and hotel operators.

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.