PBSA FURNITURE PACKAGE | 440 STUDENT ROOMS | 2,400 FURNITURE PIECES

PBSA Furniture Packages

Simetria delivered a large-scale, bespoke furniture package for 440 student accommodation rooms  in Newcastle, through a coordinated, two-phase rolling programme.

‍

Combining bespoke oak furniture, seating, tables, desk chairs, soft furnishings and decorative accessories, the project encompassed approximately 2,400 individual pieces, supported by fire safety specifications, five-year warranties and digital Furniture Passport records.

‍

The  Newcastle project involved the design coordination, procurement, manufacture and delivery of a comprehensive furniture package across 440 PBSA rooms. Delivered in two phases of approximately 1,200 pieces each, the programme required careful coordination of bespoke furniture production, supply chain management, logistics and installation sequencing.

‍

The furniture specification combined bespoke oak furniture with desk chairs, sofas, lounge chairs, artwork, coat hangers, rugs and pinboards, creating a coordinated interior scheme suitable for the demands of modern student accommodation.

‍

Particular attention was given to furniture durability, fire safety requirements and long-term operational performance, with specified CRIB 5 upholstery materials, fire-retardant foam, five-year warranties and Furniture Passport asset records.

‍

‍

What we delivered

Bespoke Oak Furniture & Specification

01

Bespoke oak furniture was coordinated with the wider student accommodation furniture specification, combining durability, functionality and consistent design across 440 rooms. The package was developed to meet the practical requirements of high-occupancy PBSA environments.

Complete Student Furniture Package

02

Simetria supplied an extensive range of furniture and interior accessories, including bespoke oak pieces, desk chairs, sofas, lounge chairs, artwork, coat hangers, rugs and pinboards. The coordinated package provided a consistent furniture specification across the accommodation.

Phased Manufacturing, Logistics & Delivery

03

Approximately 2,400 furniture pieces were coordinated across two rolling phases of 1,200 items each. Manufacturing, procurement and logistics were aligned with the phased programme to support efficient delivery and installation while reducing disruption to the wider student accommodation operation.

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.