PBSA Courtyard & Wellness Amenity, Southampton

PBSA AMENITY & OUTDOOR LIVING TRANSFORMATION

COMPLETE PBSA COURTYARD & WELLNESS AMENITY TRANSFORMATION

Simetria transformed the internal and external amenity spaces of this Southampton PBSA scheme — delivering a new yoga and wellness studio alongside a complete landscaped courtyard, outdoor bar, automated pergolas and bespoke resident furniture within a six-week programme.

‍

A complete transformation of the internal and external student amenity spaces at this Southampton PBSA scheme. Simetria created a new purpose-built yoga and wellness studio, including new flooring, lighting, air conditioning and HVAC, bespoke furniture and associated construction works.

Externally, the courtyard was comprehensively upgraded with new paving, landscaping, bespoke outdoor bar, automated  pergolas, new furniture, seating and recreational areas. Delivered as one integrated £190k programme within six weeks, the project created high-quality social, leisure and wellbeing spaces for students.

‍

What we delivered

NEW YOGA & WELLNESS STUDIO

01

Complete construction and fit-out of a new resident yoga and wellness studio, including new flooring, lighting, air conditioning and HVAC installation, bespoke furniture and joinery, new door construction and all associated finishes.

LANDSCAPED COURTYARD & AUTOMATED PERGOLAS

02

Full external courtyard transformation incorporating new paving, planting and landscaping, together with bespoke remote-controlled pergolas to create flexible, sheltered outdoor spaces for year-round resident use.

OUTDOOR BAR, FURNITURE & SOCIAL AMENITIES

03

Creation of a new outdoor bar and social area complete with bespoke furniture, tables, seating, informal bean-bag areas and table tennis, creating a flexible resident environment for dining, socialising and recreation.

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.