HILTON VILNIUS — ARCHITECTURAL & TECHNICAL LIGHTING DESIGN

HILTON VILNIUS — ARCHITECTURAL & TECHNICAL LIGHTING DESIGN

HOSPITALITY | LIGHTING DESIGN | TECHNICAL SPECIFICATION | VILNIUS, LITHUANI

Simetria delivered specialist architectural and technical lighting design for Hilton's first hotel in Vilnius, Lithuania, creating coordinated lighting solutions across the reception, lounge, restaurant, bar and communal hospitality spaces.

‍

The project combined decorative feature lighting, integrated architectural illumination and technical lighting specifications, including illuminance (lux) calculations, to balance visual comfort, functionality, atmosphere and interior design.

‍

‍

The project involved developing a coordinated lighting design strategy for the hotel's principal guest-facing environments, each requiring a distinct balance between architectural impact, functional illumination and guest comfort.

‍

Simetria's scope brought together creative lighting design and technical specification, addressing lighting levels, luminaire selection, positioning, colour temperature, visual comfort and the integration of lighting with interior architectural features.

‍

The scheme incorporated feature pendant lighting, concealed and integrated illumination, bar display lighting, downlighting and ambient lighting to establish different moods across reception, dining, lounge and bar environments.

‍

Technical lighting calculations informed the design to support appropriate illuminance levels for the different functions, while the overall lighting composition complemented the hotel's contemporary interior design.

‍

‍

What we delivered

ARCHITECTURAL LIGHTING DESIGN & SPECIFICATION

01

Simetria developed a coordinated architectural lighting design for the hotel's reception, restaurant, lounge and bar. The scheme combined decorative feature lighting, concealed illumination and integrated architectural lighting to complement the interior design, enhance guest experience and create distinctive atmospheres across the hospitality spaces.

TECHNICAL LIGHTING DESIGN & LUX CALCULATIONS

02

Our technical lighting design incorporated detailed illuminance (lux) calculations, luminaire selection, positioning, light distribution and colour temperature specifications. The design balanced functional lighting requirements, visual comfort and energy efficiency while ensuring appropriate illumination levels across dining, circulation, reception and lounge environments.

RESTAURANT, BAR & LOUNGE LIGHTING SOLUTIONS

03

The completed lighting design incorporated statement pendant features, illuminated bar shelving, integrated joinery lighting and layered ambient illumination. Each area was carefully considered to balance architectural impact with practical functionality, creating welcoming restaurant, bar and lounge environments consistent with Hilton's hospitality standards.

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.