Complete Gym Refurbishment, Design & Fit-Out

Complete Gym Refurbishment, Design & Fit-Out

Contemporary, high-quality fitness and wellbeing space

Simetria delivered a complete gym refurbishment and fit-out in a London purpose-built student accommodation (PBSA) development, transforming the existing facility into a contemporary, high-quality fitness and wellbeing space.

‍

Our integrated in-house delivery included full strip-out, new resin flooring, architectural lighting, acoustic wall treatments, mirrors, bespoke furniture, painting and decorating, branded signage and interior design. The project combined design, refurbishment and installation through one coordinated delivery programme, creating a modern student amenity designed for durability, functionality and everyday use.

‍

What we delivered

COMPLETE GYM STRIP-OUT & REFURBISHMENT

01

Full strip-out and refurbishment of the existing PBSA gym, including new resin flooring, painting, decorating and interior finishes, creating a durable, contemporary fitness environment.

LIGHTING, ACOUSTICS & INTERIOR FIT-OUT

02

Installed a new architectural lighting system, acoustic wall treatments, full-height mirrors and bespoke furniture, integrating performance, comfort and contemporary gym design.

DESIGN, BRANDING & COMPLETE DELIVERY

03

Delivered coordinated interior design, branded signage and decorative finishes, bringing together refurbishment, furniture and installation to create a cohesive, high-quality student fitness amenity.

Deep insights on other projects we have delivered

More fire door, refurbishment and furniture projects delivered for PBSA, BTR and hotel operators.

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.