FIRE DOOR REMEDIATION PROGRAMME | 319 FIRE DOORS
Fire Door Compliane
QuadReal
2026
London
Project Overview
Simetria delivered a structured fire door remediation programme across 319 doors at this London residential development. The project formed part of the same 11-building client portfolio, combining door-by-door assessment, planned corrective works and traceable compliance records within a consistent delivery framework.
Across 319 fire doors, the north Londonprogramme focused on identifying defects accurately and applying appropriate corrective works through a controlled remediation process. The project was integrated into the client's wider 4,500+ door compliance programme.
The London programme applied Simetria's portfolio methodology across 319 individual fire doors. The result was a coordinated remediation process with consistent quality controls and a clear asset-level record, supporting both immediate compliance activity and future maintenance management.
This project formed part of Simetria's wider fire door remediation programme across 11 residential buildings. Delivering the portfolio through one coordinated approach provided consistency in remediation methodology, quality assurance, reporting and accountability across more than 4,500 fire doors.
What we delivered
Individual Fire Door Survey
01
Each door was assessed and recorded to identify defects and establish the appropriate remedial action.
Efficient Remediation
02
Works focused on correcting identified defects and retaining suitable existing fire doors wherever supported by their condition and evidence.
Digital Compliance Records
03
Asset-level records captured the progression from identified defect through completed works and quality checks.