FIRE DOOR REMEDIATION PROGRAMME | 320 FIRE DOORS

Fire Door Compliance

Simetria completed a coordinated fire door remediation programme covering 320 doors at this Southall residential building. The works formed part of a wider 11-building client programme and were delivered using a consistent remediation-first strategy designed to address defects efficiently while maintaining clear asset-level compliance records.

‍

The  programme covered 320 fire doors, with assessment and corrective works coordinated as part of the client's wider multi-building compliance strategy. Simetria's approach focused on resolving identified defects while retaining existing door assets wherever appropriate.

‍

Southall demonstrates the benefit of combining individual building delivery with a portfolio-wide methodology. Across 320 doors, Simetria maintained consistent assessment, remediation and recording processes, helping the client manage compliance through one coordinated delivery partner.

‍

‍

What we delivered

Condition & Defect Review

01

The condition of each fire door was reviewed and defects captured to establish an accurate programme of corrective actions.

Corrective Remediation

02

Appropriate repairs and maintenance were undertaken to return suitable existing doors to the required condition wherever possible.

Completion Evidence

03

Works were checked and recorded to provide clear evidence of actions completed against the relevant door assets.

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.