Manchester Fire Door Remediation Project | Simetria

Fire Door Compliance

FIRE DOOR REMEDIATION | 68 FIRE DOORS

Simetria delivered a focused fire door remediation programme across 68 fire doors at this Manchester residential asset. As part of a wider 11-building portfolio programme, the works applied the same structured approach to inspection, defect resolution, quality control and compliance recording used across the client's estate.

This 68-door project formed part of a coordinated 11-building fire door remediation programme covering over 4,500 fire doors for the same client. Simetria applied a consistent remediation-first methodology, combining assessment, corrective works, quality control and asset-level compliance recording while tailoring delivery to the individual building.

‍

The Manchester project demonstrates Simetria's ability to apply portfolio-wide compliance standards to a smaller, targeted asset. The building benefited from a consistent remediation-first methodology, controlled delivery and traceable records while remaining part of a much larger 4,500+ door programme.

What we delivered

Survey & Verification

01

Each fire door was individually assessed and recorded to establish its condition, identify defects and define the appropriate corrective works.

Targeted Remediation

02

Remedial works were prioritised wherever existing doors could appropriately be retained, helping to control cost, waste and disruption.

Quality & Compliance

03

Completed works were checked and documented to provide a clear record of the actions undertaken at each asset.

Deep insights on other projects we have delivered

Absolutely amazing dolor sit amet beyond compareAbsolutely amazing dolor sit

All Fire Door Compliance Projects

London

Refurbishment

Amenity Rooms Upgrade

BTR Rooftop & Resident Lounge Upgrade, London | Simetria

ROOFTOP

GARDEN

STUDY

LOUNGE

£65K

INVESTMENT

Electrical Work

Flooring

Furnishings

Furniture

Painting and Decoration

Southampon

Integrated Projects

Summer Refurbishment

9-Studio PBSA Summer Refurbishment, Southampton | Simetria

9

STUDIOS

4

WEEKS

£100K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

York

Integrated Projects

New Studio Conversion

Resident Lounge to PBSA Studio Conversion, York | Simetria

4

CONVERSIONS

6

WEEKS

£140K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

York

Refurbishment

110 Ensuite RefurbIshment

110-Ensuite PBSA Refurbishment, York | Simetria

110

UNITS

20

WEEKS

£645K

INVESTMENT

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Painting and Decoration

Nottingham

Refurbishment

120-Unit Rolling Refurb

120-Apartment PBSA Refurbishment, Nottingham | Simetria

120

UNITS

20

WEEKS

£160K

INVESTMENT

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

London

Integrated Projects

Luxury Refurbishment

Luxury BTR Apartment Refurbishment & FF&E, London | Simetria

12

Apartments

5

Weeks

£350k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

London

Integrated Projects

Luxury Refurbishment

12 Luxury BTR Apartments Refurbished, London | Simetria

£250k

Contract value

12

APARTMENTS

5

WEEKS

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Internal Doors

Kitchens

Brighton

Refurbishment

New Luxury Apartments

ROX Brighton: 68-Apartment Interiors & FF&E | Simetria

72

Apartments

36

Weeks

£1,000k

Investment

Electrical Work

Ensuite & Bathroom Upgrade

Flooring

Furnishings

Furniture

Liverpool

Integrated Projects

Summer Refurbishments

Liverpool PBSA Refurbishment & 250 Fire Doors | Simetria

125

Unis

250

Fire Doors

£752k

Investment

Beds & Mattresses

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Liverpool

Integrated Projects

Summer Refurbishments

112-Studio PBSA Summer Refurbishment, Liverpool | Simetria

112

Units

140

Fire Doors

7

Weeks

Electrical Work

Ensuite & Bathroom Upgrade

Fire Doors

Flooring

Furnishings

London

Integrated Projects

PBSA Studio Upgrades

42-Studio PBSA Summer Refurbishment, Wembley | Simetria

42

Units

5

Weeks

£350k

Investment

Painting and Decoration

Lighting

Kitchens

Internal Doors

Furniture

London

Integrated Projects

PBSA Studio Upgrades

34-Studio PBSA Summer Refurbishment, Wembley | Simetria

36

Units

5

Weeks

£220k

Investment

Beds & Mattresses

Electrical Work

Fire Doors

Flooring

Furnishings

Contact The Team

Configure your integrated project

Select what applies. We'll show relevant experience and get you talking to the right person

(multiple select is available)
Please select at least one service.
Please enter your name.
Please enter your email or phone.
Select your Fire door option (multiple select is available)
Select your Furniture option (multiple select is available)
Rolling programme
Select your Refurbishments option (multiple select is available)
Refurbishment Options (can click more than one)
Rolling programme
Upload failed. Please retry.
Please accept the Privacy Policy.